Tribunal Awaits Results Of Tests On Ikoyi Building Materials

  The Lagos State Tribunal Inquiry into the collapse of a 21-storey building in the Ikoyi area of the state has said it is awaiting … Continue reading Tribunal Awaits Results Of Tests On Ikoyi Building Materials


A high-rise building in Ikoyi, Lagos, collapsed on November 1, 2021.
A high-rise building in Ikoyi, Lagos, collapsed on November 1, 2021.
A high-rise building in Ikoyi, Lagos, collapsed on November 1, 2021.
A high-rise building in Ikoyi, Lagos, collapsed on November 1, 2021.

 

The Lagos State Tribunal Inquiry into the collapse of a 21-storey building in the Ikoyi area of the state has said it is awaiting the results of the tests conducted on the construction materials.

Mr Toyin Ayinde, the Chairman of the panel stated this on Monday during a press conference held at the Lagos State Waterways Authority Terminal Building, Ikoyi.

He said that the panel has conducted interviews with several eyewitnesses and stakeholders and would update the public on its proceedings.

READ ALSO: Families Of Ikoyi Building Collapse Victims Seek Answers

“The tribunal began formal interviews with witnesses from Tuesday, 16th November 2021, in order to identify the roles played in the activities that led to the collapse of the building and received the report from the consultants who conducted verticality tests on the remaining structures standing in the premises of the collapsed building. The results of the tests on the construction materials are still being awaited,” Ayinde said.

“The interviews conducted have been recorded for the purpose of record-keeping, and the tribunal would meet as many as are willing to present credible and factual statements, with evidence(s), relating to the collapse.

“The tribunal’s mode of communication would be to brief the media through press releases as and when required, so that the public may be aware of the conduct of the proceedings. As we proceed, we expect your cooperation and we hope that we will, together with all stakeholders, be able to solve this problem on a permanent basis.”

The tribunal which consists of six professionals in the private sector was set up by Governor Babajide Sanwo-Olu and began sitting immediately after its inauguration on Thursday, November 4.

See the press statement issued by the Tribunal below:

FIRST PRESS CONFERENCE HELD BY THE TRIBUNAL OF INQUIRY INTO THE COLLAPSE OF THE 21-STOREY BUILDING AT 44 BCD, GERRARD ROAD, IKOYI ON MONDAY, 22ND NOVEMBER, 2021 AT THE SECRETARIAT OF THE TRIBUNAL, LASWA TERMINAL BUILDING, FIVE COWRIE CREEK, IKOYI-LAGOS

PROTOCOLS

You will all recall the sad incident of the collapse of a 21-floor structure at 44 B,C,D Gerrard Road in Ikoyi area of Lagos State, where a number of our compatriots lost their lives. Our hearts go out to the bereaved families and we should at this point observe a moment’s silence in honour of these fellow citizens. We pray that God would repose the souls of the departed.

Following the unfortunate incident, the Governor of Lagos State inaugurated a 6-man Tribunal of Inquiry for the purpose of:

  1. a) Determining the cause(s) of the collapse of the 21-storey building under construction;
  2. b) Determining whether there was full compliance with the Physical Planning, building, building materials testing, Laws and regulations in Lagos State by the developer or by any other person;
  3. c) Determining whether there was any supervisory, oversight or enforcement lapses on the part of any of the relevant regulatory authorities in the State;
  4. d) Investigating and procuring from all listed professionals on the project their contracts of service, drawings, minutes of site meetings, schedules and all other relevant documents that may assist in the inquiry;
  5. e) Investigating and conducting necessary tests on materials used for the construction of the collapsed building;
  6. f) Obtaining and scrutinizing all project drawings and specifications filed and submitted by the Developer to the Ministry of Physical Planning and Urban Development and its sister agencies for Building and Urban Development Permits/Approvals with respect to the collapsed building;
  7. g) Making recommendations on how to best ensure the safety of the construction space and prevent building collapse in Lagos State, both for development of projects and to ensure an effective and efficient regulatory environment;
  8. h) Recommending disciplinary action or prosecution of any person or corporate body found culpable, and
  9. i) Investigating any other matters incidental to any of the Terms of Reference stated above.

The Tribunal was given 30 days to complete its task.

The purpose of this Press Conference is to apprise the Press, and the general public, of what the Tribunal has done so far, and what our activities are likely to be in the remaining days ahead.

The Tribunal which comprises six professionals in the private sector, and who are certified members of their professions, began sitting immediately after its inauguration on Thursday, 4th November, 2021. There may have been concerns or agitations about why the Tribunal has not spoken to the Press. We will like to state that members of the Tribunal are professionals, and our calling demands that we make statements from informed and verified positions. We are compelled to speak only when investigations have been made, reports and documents submitted, queried, analysed and discussions held with relevant stakeholders.

So far the activities of the Tribunal have included:

  1. Setting up the Secretariat and arranging logistics for the successful conduct of activities;
  2. A visit to the site of the collapse on Friday, 5th November, for a general assessment of the rescue operations, and to determine areas where expert consultants’ services would be required.
  3. A visit to the General Hospital, Broad Street to interview some of the survivors who could offer some eyewitness accounts.
  4. Engaging the services of consultant building materials testing laboratory for the purpose of addressing item (e) of the TOR;
  5. Engaging the services of a consultant Land Surveyor to conduct verticality tests on the remaining structures within the premises of the collapsed building;
  6. Writing the relevant Government MDA’s to request for all files and documentation relating to the collapsed building.
  7. Writing to all consultants and developer/contractors associated with the project on 44 B,C,D Gerrard Road, Ikoyi; and
  8. Listing more than 30 stakeholders relevant to the construction industry and the collapsed building, whose views, position papers and recommendations would be received and considered. Those that the Tribunal consider necessary to chat with would be invited.

PROCEDURE FOR TRIBUNAL SITTING

The Tribunal would like to state that some documents have been received from some government MDA’s and members have started studying them. We have also interviewed some of the LASG staff in the relevant MDA’s. We however appeal to members of the public, professional bodies and construction industry stakeholders, as well as individuals who have useful information and invite them to submit memoranda which have direct bearing on the particular issue being investigated, as well as their recommendations to prevent future occurrence.

The Tribunal can be reached through the email address: [email protected]

This is where all memoranda, recommendations and submissions can be sent to on or before Wednesday, 24th November, 2021.

The Tribunal began formal interviews with witnesses from Tuesday, 16th November, 2021 in order to identify the roles played in the activities that led to the collapse of the building, and received the report from the consultants who conducted verticality tests on the remaining structures standing in the premises of the collapsed building. The results of the tests on the construction materials are still being awaited.

The interviews conducted have been recorded for the purpose of record-keeping, and the Tribunal would meet as many as are willing to present credible and factual statements, with evidence(s), relating to the collapse.

The Tribunal’s mode of communication would be to brief the Media through Press releases as and when required, so that the public may be aware of the conduct of the proceedings. As we proceed, we expect your cooperation and we hope that we will, together with all stakeholders, be able to solve this problem on a permanent basis.

Thank you all.

TPl. Toyin Ayinde

Chairman